Brüderkrankenhaus Trier - Neubau St. Martinus

Client
Brüderkrankenhaus Trier
Architect
Naujack Rind Hof GmbH, Koblenz
Schneider Architekten, Trier
Execution site
Trier
Execution period
2016 - 2022
Total surface
12.800 m2
  • optional service room
  • nursing room
  • endoscopy with operating rooms
  • dialysis
  • radiotherapy
  • drinking water hygiene with flow divider
  • cold water circulation
  • technical connection via tunnel system
  • grating levels in the technical shafts
  • winter heating
  • hot water via fresh water stations
More details